Hangzhou Shen Hao LTD
2023/07- 2023/10

- During my internship, I participated in multiple projects as a mechanical engineer and assisted   company employees in assembling large-scale multiple-unit testing machines.

- Throughout the internship, I independently designed and constructed a two-stage high-speed lifting device, which was successfully validated through dynamic testing.

- I also applied for a new utility model patent in the mechanical device category for the two-stage high-speed lifting device.

Mechanical Engineer

Two-stage high-speed lifting device

A two-stage high-speed lifting device designed using SolidWorks was completed after multiple iterations. Most of the components were manufactured through machining, while the rest were standard parts supplied by manufacturers such as Misumi.